From the city highway to the soccer stadium to the 290-year-old church building: the heroes of the construction site are rolling up their sleeves again. In Berlin, concrete is flowing into a 24,000 square meter construction pit. The extension of the A100 from Neukölln to Treptower Park is costing hundreds of millions. Each meter of trunk road costs around 190,000 euros. The Wildpark Stadium of Karlsruhe SC is being converted into a modern soccer arena. And in Potsdam, masons and stonemasons are building a new tower for the destroyed Garrison Church. DMAX shows the professionals who are working hard on such megaprojects to ensure that the contracts are completed on time.
https://dmax.de/sendungen/helden-der-baustelle/